Modernising control systems in power and waste-to-energy plants

Make plant modernisation deliver operational value

Quariq helps energy and power producers modernise control systems, connect asset information and apply industrial data to availability, maintenance and plant performance.

Talk with our experts

Industry overview

Plant availability depends on knowing your assets

When ageing controls and fragmented engineering, operations and maintenance data limit visibility, improvement becomes harder to plan. A scheduled modernisation window is an opportunity to address those constraints, but the programme must account for commissioning, operator readiness and existing equipment. The right starting point is the plant requirement, whether obsolete controls, unreliable asset information or a maintenance problem.

In a thermal or waste-to-energy plant, those constraints are physical. Boilers, turbines and flue gas cleaning lines run to the outage calendar, a control system near the end of its life gets harder to support every year, and a day of unplanned downtime is a day of lost generation. Operators also need to trust the new system before the plant restarts on it.

Quariq combines process automation, IT/OT, data and cybersecurity with strategic direction and delivery. We connect the technical choices with implementation and operational use, building the trusted information needed for ongoing performance improvement. We also run the programme around the technology, from supplier coordination to commissioning and operator training, so one team stays accountable from the outage plan to stable operation. The control platform is chosen for your plant, not for a vendor relationship.

Roadmap to the Future

What each stage looks like in a power plant

Units on the same site can sit at different stages: a boiler on a recently migrated DCS, a turbine still monitored from local panels. Place each unit on the four stages, then decide what to keep, migrate or connect at the next outage.

  1. Digital foundation

    A supported, redundant control system with reliable instrumentation, and process data kept in a historian instead of lost at the panel.

  2. Digital integration

    Control, historian, maintenance and engineering systems share data, so operations and maintenance work from the same picture of each asset.

  3. Data-driven production

    Availability, efficiency and asset condition tracked on shared dashboards, with each loss traced back to its cause.

  4. Smart production

    Condition-based maintenance and process optimisation, with models that flag developing faults while there is still time to plan the repair.

Our expertise and solutions

What we bring to a power plant modernisation

Whether you are modernising ageing controls, connecting plant and maintenance data or ready for condition-based maintenance, we cover each step, from the design of the new architecture to the first months of operation.

Automation

Automation

Migrate DCS, PLC and SCADA to redundant architectures, with commissioning and operator training planned into the outage.

Explore Automation

OT

OT

Connect turbines, pumps, sensors and control systems for remote monitoring and diagnostics, from one unit to several plants.

Explore OT

MES/MOM

MES/MOM

Move shift logs, operating procedures and work orders into digital workflows, so every shift hands over from the same record.

Explore MES/MOM

Data

Data

Combine engineering, operations and maintenance data with your historians in a Data Hub, for asset-performance analytics you can trust.

Explore Data

AI

AI

Apply condition-based maintenance, anomaly detection and process optimisation, so maintenance follows how equipment behaves rather than the calendar.

Explore AI

Cybersecurity

Cybersecurity

Secure DCS, SCADA and PLC environments, legacy systems included, through asset discovery, network segmentation, secure remote access and monitoring.

Explore Cybersecurity

Transformation in practice

From a 20-year-old DCS to a redundant one, on schedule

Control system migration at Tersa

How can a waste-to-energy plant replace a 20-year-old control system without losing control of the process? At Tersa in Sant Adrià de Besòs, our experts migrated the plant to a new redundant DCS, including new control cabinets and field signals, three flue gas cleaning lines, and a redesigned operator interface. The team was trained on a simulated infrastructure, and the plant was up and running on time with updated documentation.

Discover the story

Our stories

Other work in power and waste-to-energy

Energy

How Tersa used AI to cut soot blowing by 35%

Read the story

Utilities

How a European utility turned NIS requirements into an OT security roadmap

Read the story

View all stories

Questions power plants ask

Questions about power plant control system upgrades

Usually, most of the work is done before it starts. Design, configuration, and factory testing occur while the plant is still running; field signals are checked in advance; and the outage itself is reserved for the switch-over and commissioning. At Tersa, the new system went live on schedule.

By letting them run it before the plant does. Operators train on a simulated version of the new system, with the redesigned screens and alarms, so the first shift after restart is not the first time they see it. Updated documentation is handed over with the system.

Start with the assets where an unplanned stop costs the most, and the data already in your historian. Linking that process data to maintenance records shows how each asset behaves before it fails, which is what lets a model warn the maintenance team in time to plan the work. Calendar intervals stay in place until the model has proven itself.

Let's talk

Bring us your outage plan

Discuss the control-system or asset-performance constraint behind your next modernisation programme.

Talk with our experts