Data

Manufacturing data integration: one set of figures for every site

Quariq connects the data your plants already produce into one shared structure called a unified namespace (UNS). Power your dashboards, regulatory reports, and AI models to work from the same trusted industrial data.

Challenges

Why plant data rarely answers the question you ask

  • 01

    Every system has its own truth

    Historian, MES, ERP and spreadsheets each report a different OEE for the same line.

  • 02

    Values without context

    A temperature reading means little until you know which order, batch and asset it belongs to.

  • 03

    Point-to-point everywhere

    Each new dashboard or application needs another custom interface, and any change can break one.

  • 04

    Reports built by hand

    Engineers spend hours collecting figures for KPIs and audits instead of acting on them.

Most plants don't lack data. They lack data anyone can use without first asking where it came from. We make it accessible first, including data locked in legacy systems that can't connect to newer applications on their own, then give it one shared structure for every application. Whatever its source or format, each new use case starts from data that is already prepared.

A global construction chemicals group is connecting its factories through one shared Data Hub. In a pilot plant, it already carries energy, OEE and shift handover use cases.

What we deliver

From source system to daily decision

One connection per source

One connection per source

Each machine, system and site connects once to a shared Data Hub, not to every application.

Talk to our data team

Context built in

Context built in

Every value is tagged with where it came from, so it means the same in every report.

Talk to our data team

KPIs everyone agrees on

KPIs everyone agrees on

OEE, energy and quality indicators calculated once, from the same rules, and shown in real time.

Talk to our data team

Data you can report from

Data you can report from

Audit trails and data integrity controls, so figures stand up in GxP and regulatory reporting.

Read the Dara-Lyo story

Your historians, MES and databases stay in place. We connect them to the Data Hub first and add a new collection only where a use case lacks data.

Reference architecture

How a unified namespace organises plant data

Instead of a web of point-to-point interfaces, a unified namespace gives plant data one shared structure, usually the hierarchy from enterprise to site, area and line. It has four layers.

New sites follow the same structure, so each plant connects to a model the first one has already proved.

  1. Sources

    PLCs, SCADA, historians, MES, ERP, quality and maintenance systems.

  2. Connectivity

    Edge collection that brings each source into the namespace securely.

  3. Namespace

    The shared hierarchy and data models that give each value its context.

  4. Consumers

    Dashboards, analytics, AI models and reporting, each subscribing to the data it needs.

Transformation in practice

From scattered plant data to figures every site shares

Data

How Sanofi uses a golden batch to guide every production run

Read the story

Data

How LANXESS gets real-time pH from an AI soft sensor

Read the story

Data

How a European chemical manufacturer predicts reactor scaling up to six months ahead

Read the story

View all stories

Questions manufacturers ask

What manufacturers ask about manufacturing data

A unified namespace is a single data layer where every machine and system publishes its data under one shared structure, typically the plant hierarchy from enterprise down to line. Applications subscribe to the data they need instead of connecting to each source, so adding a dashboard or an AI model no longer means building another interface.

No. They keep their role. The Data Hub sits alongside them, collects what they hold and adds context. Replacement only comes up when a system can't share its data or can no longer be supported, and then it is planned as a separate step.

It usually shows up in time first: hours no longer spent compiling KPIs and audit figures by hand. The larger value comes later, when each new dashboard or AI use case reuses the Data Hub instead of paying for its own integration. We set a baseline for both at the start.

By agreeing the definitions before building dashboards: what counts as downtime, which batch a value belongs to, which source wins when two disagree. Validation rules and audit trails then keep it that way, which is what GxP and regulatory reporting require.

Yes, and it is usually the best first step. One site and two or three use cases prove the model. The structure is designed from the first day so the next sites plug into it rather than starting over.

If the figures match what they see on the line, yes. Shift leads and engineers help define the KPIs and screens, and each dashboard is built to answer the questions of the daily production meeting.

Let's talk

Talk with our industrial data team

Pick one decision your teams struggle to make from today's data. Our industrial data team will trace where the data for it lives and what connecting it would involve.

Let's turn your data into a trusted asset