OT / IT Integration

IT/OT convergence that scales across sites

Connecting machines, control systems and enterprise IT across your plants. We create converged IT and OT architecture designed to scale.

Challenges

Why connecting the plant gets harder with every project

  • 01

    Islands of automation

    Each line runs its own network and protocols, so data stays where it was produced.

  • 02

    IT and OT plan separately

    IT standardises servers and networks. OT can't stop production to follow, so both work around each other.

  • 03

    Ageing plant infrastructure

    Servers and switches run past their support life because replacing them means downtime.

  • 04

    Asset status arrives late

    Machine problems reach maintenance by phone or shift report, not as they happen.

Connecting one machine is quick. Connecting it so the fifth plant can repeat it, and IT can support it for years, is the real work. Without an architecture, every quick connection becomes the next legacy problem, so we design the architecture first.

What we deliver

What connects your plant floor to the rest of the business

  • Machines that share their data

    Connectivity for PLCs, controllers and sensors, including legacy equipment, through standard industrial protocols.

  • Data collected at the edge

    Edge devices gather, buffer and pre-process data close to the line, so nothing is lost when links drop.

  • Infrastructure IT can support

    Virtualised plant servers and standardised networks that IT and OT maintain together.

  • Assets you can watch live

    Real-time status of machines and assets on the screens maintenance and operations already use.

We map what is already connected and how, then decide line by line what to keep, what to bridge with an edge layer and what to rebuild.

Reference architecture

The layers between a machine and your enterprise systems

A reference OT architecture gives every site the same answer to where things connect, where data is collected and who looks after what. Ours follows the Purdue model and ISA-95 levels most plants already recognise, and applies IEC 62443 zones and conduits at every boundary between them.

Read by owner, the same model is a responsibility map: when something stops, everyone knows whose layer it is.

  1. Enterprise and cloud

    ERP, data platforms, analytics and remote services. Who looks after it: IT

  2. Industrial DMZ

    The controlled boundary between plant and enterprise networks. Who looks after it: OT, IT and security

  3. Plant infrastructure

    Virtualised servers, plant network, historians and MES hosting. Who looks after it: OT and IT together

  4. Supervisory and edge

    SCADA, HMIs, edge devices and gateways. Who looks after it: OT team

  5. Field and control

    Sensors, drives, PLCs and DCS controllers. Who looks after it: Automation team

Delivery lifecycle

From one connected plant to every site

  1. Discover

    Networks, assets, interfaces and constraints mapped at a representative site. What you have at the end: A current-state map and the gaps that matter.

  2. Standardise

    Target architecture and a site template: network design, edge set-up, naming and support model. What you have at the end: A standard every plant can follow.

  3. Pilot

    The template goes live on one site and is adjusted to what that site shows. What you have at the end: A proven, documented build.

  4. Roll out

    Remaining sites follow the template in planned windows, adapting only where a plant differs. What you have at the end: Every site connected the same way.

  5. Run

    Monitoring, patching and lifecycle planning shared between IT and OT. What you have at the end: Infrastructure that stays supported.

Transformation in practice

How manufacturers connected their plants without starting over

OT

How Elian Barcelona rebuilt its plant's OT with a 10-day cutover

Read the story

OT

How a European oils and fats refiner virtualised its whole control system in four months

Read the story

OT

How a European utility turned NIS requirements into an OT security roadmap

Read the story

View all stories

Questions manufacturers ask

What manufacturers ask about IT/OT convergence

IT/OT convergence means operational technology (machines, control systems and plant networks) and information technology (ERP, data platforms and enterprise networks) share data, infrastructure and standards instead of running as separate worlds. In practice it needs a common architecture, clear ownership between teams and a controlled boundary between plant and enterprise networks.

IT manages information: business systems, office networks and data centres, updated on a regular cycle. OT manages physical processes: controllers, machines and plant networks that run around the clock and stay in service far longer. The two have different priorities, so convergence needs shared rules rather than one team adopting the other's.

Rarely. Most legacy controllers can be read through gateways or protocol converters without changing their logic. Replacement makes sense when equipment is out of support or can't deliver the data a use case needs, and then it is planned together with the Automation team.

Done properly, three things: lower cost to support plant infrastructure, faster rollout of each new use case, and less downtime caused by unmanaged hardware. Done without a security model, convergence opens new gaps, which is why we build on the Purdue model, ISA-95 and IEC 62443. We measure the gains against today's baseline, site by site.

Much of it can be virtualised on site: SCADA servers, historians and engineering stations run reliably on shared plant hardware with proper redundancy. Moving control-critical systems to the cloud is a different decision, driven by latency and availability, so we make it system by system.

Fewer unknowns. Maintenance sees problems on screen instead of hearing about them on the phone, and live asset data makes preventive and predictive maintenance possible. IT supports infrastructure built the same way at every site, so a solution proven in one plant scales to the next. Both teams agree the support model before go-live.

Let's talk

Talk with our OT architecture team

Start with one site you would like to connect better, or a pilot you want to scale. Our OT architects will review what is in place and outline the architecture the next sites could follow.

Let's talk about your factory's OT